History of origins of Birsfelden Hydroelectric Plant
The construction of Birsfelden Hydroelectric Plant began in 1950, it started operations in 1954. In 1978 the large lock was expanded by a second one, to guarantee maximum capacity in case of failure in one of the locks.
The most prominent change was the modernisation in 1995: the entire plant was brought up to date, to increase production and reduce staff costs. By around the mid 21st century, a renovation of the plant will be necessary. The license to operate the plant extends to 2034.
From a conversation with Werner Maier, director of Birsfelden Hydroelectric Plant
Pictures: © Birsfelden Hydroelectric Plant