Disposal routes of contaminated material, Novartis Campus
Overall, 195,190 tons of contaminated material have been removed from the site of the old port of St. Johann. If categorised as ESAR, Gravel/Concrete Recycling, Thermal Processing or Covering, the materials can stay in the materials cycle, materials categorised as Inert or Reactor Waste however, have to be disposed of permanently.
Source: Eberhard Bau AG