Disposal routes of contaminated material, Novartis Campus

stat_tox_en_001

Overall, 195,190 tons of contaminated material have been removed from the site of the old port of St. Johann. If categorised as ESAR, Gravel/Concrete Recycling, Thermal Processing or Covering, the materials can stay in the materials cycle, materials categorised as Inert or Reactor Waste however, have to be disposed of permanently.

Source: Eberhard Bau AG